0 h
Operational downtime
Work done from 10 p.m. to 6 a.m., corridors reopened before opening.
Corridors dulled by ten years of traffic had to regain their finish without closing the building for a single day.
0 h
Work done from 10 p.m. to 6 a.m., corridors reopened before opening.
11 000 pi²
Stripped, waxed and polished over two consecutive nights.
+3 ans
Floor replacement deferred thanks to the periodic care program.
The client folded annual stripping and seasonal window washing into their recurring contract.
Online quote in minutes, reply within 1 business day.